Asbestos Removal in Renton

At Renton Asbestos Removal, we make asbestos removal quick and easy for homeowners and property managers alike. Our proven methods include a decade of experience, reliable professionals, guaranteed work, and affordable pricing. Call now for a free, personalized quote, no obligation.

For us, every project is unique and we always focus on your home's needs. Whether you are refreshing one unit or preparing a larger renovation, we begin with the building's use and the desired end result. Flooring, ceiling finishes, insulation and exterior materials all get their own place in our careful planning. Scroll down to learn more about asbestos removal and our unique approach.

Empty room sealed for asbestos abatement with walls, floor and windows covered in clear plastic sheeting
Asbestos testing and surveysPopcorn ceiling removalFloor tile and sheet vinylSiding and roofingPre-demolition abatementRented houses, duplexes and apartment buildings

Residential asbestos removal

Entry of a 1970s split-level with small taped sample spots on the ceiling, wall and floor and sealed sample bags on a stepEmpty 1970s rambler living room and hall with popcorn ceilings throughout, bare floors, plastic sheeting rolled out on the floor

Asbestos testing and surveys

Planning a remodel and unsure what is behind the paint? Start with a test. A lab checks small samples of the ceiling, floor or wall you plan to disturb, and a short report says which materials contain asbestos, where they are and how much. If you live in your single-family house, you may take the samples yourself.

Popcorn ceiling removal

Spray-on ceiling texture in an older house may contain asbestos, so a chip is sent to the lab before any scraping. A positive result means the room is closed off, the texture is wetted to keep dust down and it is scraped into bags. The Clean Air Agency asks for a notice at 48 square feet in a calendar year, about a 6-by-8-foot patch. A 10-by-12-foot bedroom ceiling, at 120 square feet, is well past that.

Entry hall of an older house with a patterned vinyl floor, plastic sheeting taped along the walls and a half bath beyond the open doorGray cement-shingle siding on the exterior of a house

Floor tile and sheet vinyl

Old vinyl tile and its black glue can contain asbestos. When the tile comes up in one piece, the agency asks for no notice, provided nobody sands or grinds it. A kitchen or laundry room can hide a second floor under the first, so every layer is sampled before work starts.

Siding and roofing

Gray cement shingles and some older roofing may contain asbestos. Samples are tested before anything comes off, and the shingles are kept wet and lifted whole. The same house can fall under two rules. Cement siding counts as crumbly material, so it needs a notice above the size limit, while the agency lists asbestos roofing as needing none.

Older wood-sided house behind a chain-link fence, prepared for demolition, with a plastic-lined dumpster, wet gravel and fir trees under an overcast sky

Pre-demolition abatement

Renton wants an asbestos abatement report from an approved asbestos remediation company along with the demolition permit application and site plan. We arrange the survey, line up the report and the agency notice, and remove what the survey finds. Demolition can start after the 10-day wait.

Rental and apartment abatement

Two-story 1960s garden apartment building with exterior walkways, wood siding and brick, under an overcast sky

Rented houses, duplexes and apartment buildings

Landlords cannot use the owner-occupant shortcuts. They need an accredited inspector for surveys and certified workers for removal. About 46% of Renton households rent, and a third of homes are in buildings of five or more units.

Asbestos testing and removal costs

Nearly 4 in every 10 Renton homes were built before 1980, making asbestos a common issue in our community. Our price ranges cover hired labor, materials, containment, lab fees and disposal for typical jobs in Renton, Bryn Mawr-Skyway and East Renton Highlands. Expect the low figure for a small job with easy access, and the top for bigger areas, occupied buildings, second stories or extra air tests.

Asbestos testing and surveys

  • Testing a few materials, up to about 4 samples$300 – $600+
  • Asbestos survey before a remodel, one house$400 – $1,000+
  • Asbestos survey before tearing down a house$800 – $2,000+
  • Survey of a small commercial or apartment building$1,500 – $4,000+
What is included

Small samples go to a lab, and the report names each positive material, its room and its amount, which is what contractors bid from. A survey before a teardown covers the whole building.

Get a free quoteSee an example project

Popcorn ceiling removal

  • One room ceiling, about 150 to 250 sq ft$1,800 – $4,500+
  • Several rooms or one floor, about 600 to 1,000 sq ft$5,500 – $14,000+
  • Whole house, about 1,500 to 2,000 sq ft of ceiling$10,000 – $25,000+
What is included

The room is cleared and walled off, the texture is soaked and it is scraped into bags. From 48 sq ft in a calendar year, a notice goes to the clean air agency first. Disposal and a final clean are part of the range. Skim coat and paint are not.

Get a free quoteSee an example project

Floor tile and sheet vinyl removal

  • One bathroom or laundry floor, about 50 to 100 sq ft$1,200 – $3,000+
  • One kitchen or large room, about 150 to 300 sq ft$1,800 – $5,000+
  • Several rooms, about 500 to 1,000 sq ft$4,000 – $12,000+
What is included

Whole pieces of tile come up and the black glue is scraped wet. Sheet vinyl with a crumbling backing is handled as friable and gets a notice. Plastic, bags, disposal and cleanup are included. The new floor is not.

Get a free quoteSee an example project

Siding and roofing removal

  • Siding on one wall, garage or shed, about 200 to 400 sq ft$2,500 – $6,500+
  • Siding on a one-story house, about 1,200 to 1,800 sq ft of wall$10,000 – $25,000+
  • Siding on a two-story house, about 2,000 to 3,000 sq ft of wall$16,000 – $40,000+
What is included

Shingles and cement board stay wet and come off whole, then are wrapped and hauled to an approved site. Cement board is friable, so the notice goes first. A roof is quoted separately after a roof survey.

Get a free quoteSee an example project

Pre-demolition abatement

  • Asbestos survey before tearing down a house$800 – $2,000+
  • Abatement of a whole house before tear-down$10,000 – $30,000+
What is included

Survey, removal of everything positive, disposal and the abatement report for the permit file, then the notice with its 10-day wait. The wrecking crew's work is a separate price.

Get a free quoteSee an example project

Rental and apartment abatement

  • Survey of a small apartment or commercial building$1,500 – $4,000+
  • Common areas or one section of a building, about 500 to 1,000 sq ft$5,000 – $15,000+
What is included

Inspection by an accredited inspector, removal by certified workers away from tenants, disposal, and whatever notices the amount requires. Larger buildings and bigger sections are priced after a visit.

Get a free quoteSee an example project

Ranges are 2026 estimates, not quotes. Call today for a free, personalized quote.

Our process

01

Test what you will disturb

Small samples go to a lab, and we go over the results with you. The list shows what is positive, in which room and how much. Everything after it depends on that list.

02

Match the paperwork to the amount

Small jobs may need no notice at all. Crumbly (friable) material needs a Clean Air Agency notice first once a job reaches 48 square feet in a year or 10 linear feet of pipe wrap, and hard material such as whole tile needs none. L&I has its own notice for bigger jobs. A roof over 120 square feet needs a demolition notice with the agency.

03

Seal off, wet down, remove

Plastic walls and signs close off the work area. Everything stays wet while it comes out, and it goes into leak-tight containers before the day ends. Outside your own single-family home, Washington requires certified workers under a certified supervisor.

04

Take it to the right place

Asbestos waste cannot go out with the garbage. It goes to an approved site with the right paperwork, such as Republic Services in Seattle or, by appointment, Cedar Hills Landfill in Maple Valley.

Renton homes and asbestos

Renton’s homes were built over many decades, and about a quarter of them date from the 1960s and 1970s.

Year built is a pointer. Only a lab result tells you what is in a particular ceiling or floor.

The Puget Sound Clean Air Agency and L&I require an asbestos survey before any renovation or demolition work, and the City of Renton’s remodel page says so too.

Serving Renton, Bryn Mawr-Skyway and East Renton Highlands

We also serve Bryn Mawr-Skyway and East Renton Highlands. Call us for confirmation if your address is outside the area.

Frequently asked questions

Can I remove asbestos myself in Renton?

Only if the building is a single-family house that you own and live in. Landlords, tenants and condo or duplex owners need a certified contractor. Even an owner doing the job must follow the rules on wet work and disposal.

Do I need a survey before a remodel?

Yes, before any work that will disturb a suspect material, and the city requires one for renovation and demolition. In a house you own and live in, you may do the survey for your own remodel. For a rental or any other house, an accredited inspector signs it.

What does a Renton demolition permit ask for?

Renton asks for a signed application, a site plan and an asbestos abatement report from an approved asbestos remediation company. The Clean Air Agency may need a notice first, so check with it too. Building customer service, at 425-430-7215, can confirm the current list.

What changes the price?

Price follows the material, the amount, how easy the space is to reach, the containment needed, who lives there and the haul to disposal. A measured survey turns a guess into a quote.

Where does asbestos waste from Renton go?

Any city or county can send loads to Republic Services in Seattle. Cedar Hills Landfill in Maple Valley accepts King County waste from outside Seattle and Milton too, though only by appointment on Tuesday and Friday. Paperwork rules differ at each site, so call ahead.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (425) 981-5281

Call (425) 981-5281